[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165132":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1165132,826,2,"多选题","当出现（ ）情况之一时，施工升降机整机应判为不合格。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","结构件锈蚀",false,{"key":16,"text":17,"correct":14},"B","结构件裂纹",{"key":19,"text":20,"correct":14},"C","结构件变形",{"key":22,"text":23,"correct":24},"D","重要结构件检测有指标不合格的",true,{"key":26,"text":27,"correct":24},"E","有保证项目不合格的","DE","当出现重要结构件检测有指标不合格的、有保证项目不合格的情况之一时，施工升降机整机应判为不合格。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)专业管理实务 岗位知识","建筑工程",0]