[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165024":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1165024,826,2,"多选题","施工机械设备成本相关性原则包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","成本信息的有用性",true,{"key":16,"text":17,"correct":14},"B","成本信息的及时性",{"key":19,"text":20,"correct":14},"C","成本核算要为管理当局提供有用的信息，为成本管理、预测、决策服务",{"key":22,"text":23,"correct":24},"D","由本期成本负担的费用，不论是否已经支付，都要计人本期成本",false,{"key":26,"text":27,"correct":24},"E","所耗用的原材料、燃料、动力要按实际耗用数量的实际成本计算","ABC","施工机械设备成本相关性原则包括成本信息的有用性、成本信息的及时性、成本核算要为管理当局提供有用的信息，为成本管理、预测、决策服务。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)专业管理实务 岗位知识","建筑工程",0]