[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164957":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1164957,826,1,"单选题","建筑起重机械在使用过程中需要（ ）的，使用单位委托原安装单位或者具有相应资质的安装单位按照专项施工方案实施后，并按规定组织验收。验收合格后方可投入使用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","顶升",false,{"key":16,"text":17,"correct":18},"B","附着",true,{"key":20,"text":21,"correct":14},"C","检查",{"key":23,"text":24,"correct":14},"D","维保","第二十条建筑起重机械在使用过程中需要附着的，使用单位委托原安装单位或者具有相应资质的安装单位按照专项施工方案实施，并按照本规定第十六条规定组织验收。验收合格后方可投入使用。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]