[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164953":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1164953,826,1,"单选题","建筑施工现场临时用电工程采用（ ）漏电保护系统。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","三级",false,{"key":16,"text":17,"correct":18},"B","二级",true,{"key":20,"text":21,"correct":14},"C","一级",{"key":23,"text":24,"correct":14},"D","四级","建筑施工现场临时用电工程采用二级漏电保护系统。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]