[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164950":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1164950,826,1,"单选题","塔式起重机安装、拆卸单位应具备（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全管理保证体系",true,{"key":16,"text":17,"correct":18},"B","质量管理保证体系",false,{"key":20,"text":21,"correct":18},"C","应急管理保证体系",{"key":23,"text":24,"correct":18},"D","环境管理体系","塔式起重机安装、拆卸单位应具备安全管理保证体系。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]