[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164689":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1164689,826,1,"单选题","大型设备的安装、拆卸，都必须制定（ ），经审批后方可实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","专项施工方案",true,{"key":16,"text":17,"correct":18},"B","施工组织设计",false,{"key":20,"text":21,"correct":18},"C","应急计划",{"key":23,"text":24,"correct":18},"D","危险源评估方案","大型设备的安装、拆卸，都必须制定专项施工方案，经审批后方可实施。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]