[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164632":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1164632,826,1,"单选题","临时用电工程必须经编制、审核、批准部门和使用单位共同（ ），合格后方可投人使用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","验收",true,{"key":16,"text":17,"correct":18},"B","设计",false,{"key":20,"text":21,"correct":18},"C","施工",{"key":23,"text":24,"correct":18},"D","检查","临时用电组织设计及变更用电时，必须履行“编制、审核、批准”程序5由电气工程技术人员组织编制，经相关部门审核及具有法人资格企业的技术负责人批准后实施。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]