[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164588":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1164588,826,1,"单选题","临时用电组织设计应按照工程规模、场地特点、负荷性质、用电容量、地区供用电条件等实际情况，合理确定（ ）方案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","验收",false,{"key":16,"text":17,"correct":18},"B","设计",true,{"key":20,"text":21,"correct":14},"C","施工",{"key":23,"text":24,"correct":14},"D","检查","临时用电组织设计应按照工程规模、场地特点、负荷性质、用电容量、地区供用电条件等实际情况，合理确定设计方案。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)专业管理实务 岗位知识","建筑工程",0]