[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164300":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1164300,825,3,"判断题","现场管理目标就是：科学安排、合理调配使用施工用地，并使之与各种环境保持协调关系。项目施工结束后，督促有关单位及时拆除临时设施并退场，以便重新规划使用或永久绿化。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(机械员)基础知识","建筑工程",0]