[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164053":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1164053,825,2,"多选题","分部分项工程量清单项目表的编制内容主要有（ ）等。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","项目编号的确定",true,{"key":16,"text":17,"correct":14},"B","项目名称的确定",{"key":19,"text":20,"correct":21},"C","工程内容的描述",false,{"key":23,"text":24,"correct":14},"D","计量单位的选定",{"key":26,"text":27,"correct":14},"E","工程量的计算","ABDE","分部分项工程量清单项目表的编制内容主要有项目编号的确定、量单位的选定、项目名称的确定、工程量的计算等。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)基础知识","建筑工程",0]