[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164052":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1164052,825,2,"多选题","建筑安装工程的税金等于（ ）之和乘以综合税率（％）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单费用",true,{"key":16,"text":17,"correct":14},"B","措施项目清单计价",{"key":19,"text":20,"correct":14},"C","其他项目费用",{"key":22,"text":23,"correct":24},"D","利润",false,{"key":26,"text":27,"correct":14},"E","规费","ABCE","建筑安装工程的税金等于分部分项工程量清单费用、措施项目清单计价、其他项目费用、规费之和乘以综合税率（％）。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)基础知识","建筑工程",0]