[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164051":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1164051,825,2,"多选题","工程量清单是表现拟建工程的（ ）的明细清单。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","分部分项工程项目",true,{"key":16,"text":17,"correct":18},"B","工程定额",false,{"key":20,"text":21,"correct":14},"C","措施项目",{"key":23,"text":24,"correct":18},"D","工程量",{"key":26,"text":27,"correct":14},"E","其他项目名称和相应数量","ACE","工程量清单，是表现拟建工程的分部分项工程项目、措施项目、其他项目名称和相应数量的明细清单，由招标人按照《计价规范》附录中统一的项目编码、项目名称、计量单位和工程量计算规则进行编制，包括分部分项工程量清单、措施项目清单、其他项目清单。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)基础知识","建筑工程",0]