[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1164001":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1164001,825,2,"多选题","施工项目进度控制的措施包括（ ）等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","组织措施",true,{"key":16,"text":17,"correct":14},"B","技术措施",{"key":19,"text":20,"correct":14},"C","合同措施",{"key":22,"text":23,"correct":14},"D","经济措施",{"key":25,"text":26,"correct":27},"E","纪律措施",false,"ABCD","施工项目进度控制的措施主要有组织措施、技术措施、合同措施、经济措施和信息措施等。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)基础知识","建筑工程",0]