[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163980":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1163980,825,2,"多选题","当基础土质均匀且地下水位低于基坑（槽）底面标高时，挖方边坡可挖成直坡式而不加支护，但挖深不宜超过“（ ）”的规定。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","密实、中密的碎石类和碎石类土（充填物为砂土）1.0m",true,{"key":16,"text":17,"correct":18},"B","硬塑、可塑的黏土及粉质黏土1.25m",false,{"key":20,"text":21,"correct":14},"C","硬塑、可塑的黏土及粉质黏土1.5m",{"key":23,"text":24,"correct":14},"D","硬塑、可塑的黏土及碎石类土（充填物为黏性土）1.5m",{"key":26,"text":27,"correct":18},"E","硬塑、可塑的黏土及碎石类土（充填物为黏性土）2.0m","ACD","当基础土质均匀且地下水位低于基坑（槽）底面标高时，挖方边坡可挖成直坡式而不加支护，但挖深不宜超过“密实、中密的碎石类和碎石类土（充填物为砂土）1.0m；硬塑、可塑的黏土及粉质黏土1.5m；硬塑、可塑的黏土及碎石类土（充填物为黏性土）1.5m”的规定。",{"id":6,"name":31,"category":32,"favorite":33},"(机械员)基础知识","建筑工程",0]