[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163793":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1163793,825,1,"单选题","全套管钻机第一节套管人土后，应随时调整套管的垂直度。当套管人土（ ）m以下时，不得强行纠偏。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":18},"B","5",true,{"key":20,"text":21,"correct":14},"C","8",{"key":23,"text":24,"correct":14},"D","10","全套管钻机第一节套管人土后，应随时调整套管的垂直度。当套管人土5m以下时，不得强行纠偏。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]