[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163732":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":21,"analysis":24},1163732,825,1,"单选题","新安装或转移工地重新安装以及经过大修后的升降机，在投人使用前，必须经过（ ）试验。",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","载重",false,{"key":16,"text":17,"correct":14},"B","制动",{"key":19,"text":17,"correct":14},"C",{"key":21,"text":22,"correct":23},"D","坠落",true,"新安装或转移工地重新安装以及经过大修后的升降机，在投人使用前，必须经过坠落试验。",{"id":6,"name":26,"category":27,"favorite":28},"(机械员)基础知识","建筑工程",0]