[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163729":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1163729,825,1,"单选题","起重机安装过程中，必须分阶段进行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全检查",false,{"key":16,"text":17,"correct":18},"B","技术检验",true,{"key":20,"text":21,"correct":14},"C","安装抽查",{"key":23,"text":24,"correct":14},"D","质量检查","起重机安装过程中，必须分阶段进行技术检验。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]