[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163660":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1163660,825,1,"单选题","设计单位或施工单位根据施工图纸，按照现行的工程定额预算价格编制的工程建设项目从筹建到竣工验收所需的全部建设费用称为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","结算",false,{"key":16,"text":17,"correct":18},"B","预算",true,{"key":20,"text":21,"correct":14},"C","核算",{"key":23,"text":24,"correct":14},"D","决算","预算：是设计单位或施工单位根据施工图纸，按照现行的工程定额预算价格编制的工程建设项目从筹建到竣工验收所需的全部建设费用。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]