[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163659":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1163659,825,1,"单选题","某包工包料的住宅楼电气设备安装工程，主要进行住宅楼的照明和防雷接地的安装。施工中需要进行脚手架的搭拆与一定的夜间加班赶工，试问： 在工程量清单项目编码中，电气设备安装工程前四位的编码是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","0101",false,{"key":16,"text":17,"correct":14},"B","0104",{"key":19,"text":20,"correct":14},"C","0301",{"key":22,"text":23,"correct":24},"D","0304",true,"在工程量清单项目编码中，电气设备安装工程前四位的编码是0304。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]