[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163654":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1163654,825,1,"单选题","施工单位根据竣工图纸，按现行工程定额实际价格编制的工程建设项目从开工到竣工验收所需的全部建设费用称为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","结算",true,{"key":16,"text":17,"correct":18},"B","预算",false,{"key":20,"text":21,"correct":18},"C","核算",{"key":23,"text":24,"correct":18},"D","决算","结算：是施工单位根据竣工图纸，按现行工程定额实际价格编制的工程建设项目从开工到竣工验收所需的全部建设费用。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]