[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163572":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1163572,825,1,"单选题","施工项目管理的对象是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工项目",true,{"key":16,"text":17,"correct":18},"B","工程项目",false,{"key":20,"text":21,"correct":18},"C","施工材料",{"key":23,"text":24,"correct":18},"D","施工机械","施工项目管理的对象是施工项目。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]