[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163570":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1163570,825,1,"单选题","目标管理的系统控制过程应是（ ）的动态控制过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划——执行——检查——纠偏——新计划",true,{"key":16,"text":17,"correct":18},"B","执行——检查——纠偏——计划",false,{"key":20,"text":21,"correct":18},"C","检查——纠偏——新计划——执行",{"key":23,"text":24,"correct":18},"D","纠偏——计划——执行——检查","目标管理的系统控制过程应是计划——执行——检查——纠偏——新计划的动态控制过程。",{"id":6,"name":27,"category":28,"favorite":29},"(机械员)基础知识","建筑工程",0]