[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-824-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":380},{"id":5,"name":6,"category":7,"favorite":8},824,"通用基础","建筑工程",0,8,50,493,[13,38,53,68,83,97,112,122,128,134,140,146,152,158,164,170,176,182,188,194,200,206,212,218,224,230,236,242,248,254,260,266,272,278,284,290,296,302,308,314,320,326,332,338,344,350,356,362,368,374],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1163284,2,"多选题","《安全生产法》第17条规定,生产经营单位的主要负责人对本单位安全生产工作负有以下责任( )。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","建立、健全本单位安全生产责任制",true,{"key":24,"text":25,"correct":22},"B","组织制定本单位安全生产规章制度和操作规程",{"key":27,"text":28,"correct":22},"C","保证本单位安全生产投入的有效实施",{"key":30,"text":31,"correct":22},"D","督促、检查本单位安全生产工作,及时消除生产安全事故隐患",{"key":33,"text":34,"correct":35},"E","安全事故后及时进行处理",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1163285,"《建筑法》规定,交付竣工验收的建筑工程必须符合( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"必须符合规定的建筑工程质量标准",{"key":24,"text":45,"correct":22},"有完整的工程技术经济资料和经签署的工程保修书",{"key":27,"text":47,"correct":22},"具备国家规定的其他竣工条件",{"key":30,"text":49,"correct":22},"建筑工程竣工验收合格后,方可交付使用",{"key":33,"text":51,"correct":22},"未经验收或者验收不合格的,不得交付使用","ABCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1163286,"《建筑法》规定:禁止总承包单位将工程分包给不具备相应资质条件的单位,禁止分包单位将其承包的工程再分包。以下情形属于违法分包的是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"分包单位将其承包的建设工程再分包的",{"key":24,"text":60,"correct":35},"施工总承包人或专业分包人将其承包]二程中的劳务作业分包给施工劳务企业",{"key":27,"text":62,"correct":22},"总承包单位将建设工程分包给不具备相应资质条件的单位的",{"key":30,"text":64,"correct":22},"建设丁程总承包合同中未有约定,又未经建设单位认可,承包单位将其承包的部分建设工程交由其他单位完成的",{"key":33,"text":66,"correct":22},"施工总承包单位将建设工程主体结构的施工分包给其他单位的","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1163287,"建设工程施工合同具有下列情形之一的，认定无效：( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":35},"施工总承包单位将劳务作业分包给具有相应资质等级的施工劳务企业的",{"key":24,"text":75,"correct":22},"建设工程必须进行招标而未招标或者中标无效的",{"key":27,"text":77,"correct":22},"承包人未取得建筑施工企业资质或者超越资质等级的",{"key":30,"text":79,"correct":22},"没有资质的实际施工人借用有资质的建筑施工企业名义的",{"key":33,"text":81,"correct":35},"特级房屋建筑工程施工总承包单位承担单项建安合同额超过企业注册资本金5倍的建筑面积20万m²以上的住宅小区建设的","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},1163288,"《建筑法》规定( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"承包企业应当持有依法取得的资质证书",{"key":24,"text":90,"correct":22},"应在其资质等级许可的业务范围内承揽工程",{"key":27,"text":92,"correct":22},"禁止超越本企业资质等级许可的业务范围承揽工程",{"key":30,"text":94,"correct":22},"禁止其他单位或个人以本企业名义承揽工程",{"key":33,"text":96,"correct":35},"建筑工程安全生产管理必须坚持安全第一、预防为主的方针",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1163289,"建筑业企业资质分为( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"施工总承包",{"key":24,"text":104,"correct":22},"专业承包",{"key":27,"text":106,"correct":22},"施工劳务",{"key":30,"text":108,"correct":35},"土石方承包",{"key":33,"text":110,"correct":35},"脚手架作业承包","ABC",{"id":113,"libraryId":5,"type":114,"typeLabel":115,"stem":116,"options":117,"answer":121,"analysis":37},1163290,3,"判断题","施工现场包括红线以内占用的建筑用地和施工用地以及临时施工用地。",[118,120],{"key":20,"text":119,"correct":35},"正确",{"key":24,"text":121,"correct":22},"错误",{"id":123,"libraryId":5,"type":114,"typeLabel":115,"stem":124,"options":125,"answer":119,"analysis":37},1163291,"安全管理的对象是生产中一切人、物、环境、管理状态,安全管理是一种动态管理。",[126,127],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":129,"libraryId":5,"type":114,"typeLabel":115,"stem":130,"options":131,"answer":119,"analysis":37},1163292,"在现代施工企业的项目管理中,施工项目经理是施工项目的最高责任人和组织者,是决定施工项目盈亏的关键性角色。",[132,133],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":135,"libraryId":5,"type":114,"typeLabel":115,"stem":136,"options":137,"answer":121,"analysis":37},1163293,"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时,不宜采用绑扎搭接接头。",[138,139],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":141,"libraryId":5,"type":114,"typeLabel":115,"stem":142,"options":143,"answer":121,"analysis":37},1163294,"钢筋混凝土扩展基础施工工艺流程:测量放线→基坑开挖、验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土。",[144,145],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":147,"libraryId":5,"type":114,"typeLabel":115,"stem":148,"options":149,"answer":119,"analysis":37},1163295,"土方回填压实的施工工艺流程:填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验,符合设计要求后,填筑上一层。",[150,151],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":153,"libraryId":5,"type":114,"typeLabel":115,"stem":154,"options":155,"answer":121,"analysis":37},1163296,"基坑（槽）开挖施工工艺流程:测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[156,157],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":159,"libraryId":5,"type":114,"typeLabel":115,"stem":160,"options":161,"answer":119,"analysis":37},1163297,"建筑平面图中凡是被剖切到的墙、柱断面轮廓线用粗实线画出,其余可见的轮廓线用中实线或细实线,尺寸标注和标高符号均用细实线,定位轴线用细单点长画线绘制。",[162,163],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":165,"libraryId":5,"type":114,"typeLabel":115,"stem":166,"options":167,"answer":121,"analysis":37},1163298,"建筑总平面图是将拟建工程四周一定范围内的新建、拟建、原有和将拆除的建筑物、构筑物连同其周围的地形地物状况,用正投影方法画出的图样。",[168,169],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":171,"libraryId":5,"type":114,"typeLabel":115,"stem":172,"options":173,"answer":119,"analysis":37},1163299,"房屋建筑施工图是工程设计阶段的最终成果,同时又是工程施工、监理和计算工程造价的主要依据。",[174,175],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":177,"libraryId":5,"type":114,"typeLabel":115,"stem":178,"options":179,"answer":119,"analysis":37},1163300,"冲击韧性指标是通过标准试件的弯曲冲击韧性试验确定的。",[180,181],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":183,"libraryId":5,"type":114,"typeLabel":115,"stem":184,"options":185,"answer":119,"analysis":37},1163301,"混凝土外加剂按照其主要功能分为高性能减水剂、高效减水剂、普通减水剂、引气减水剂、泵送剂、早强剂、缓凝剂和引气剂共八类。",[186,187],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":189,"libraryId":5,"type":114,"typeLabel":115,"stem":190,"options":191,"answer":121,"analysis":37},1163302,"气硬性胶凝材料只能在空气中凝结、硬化、保持和发展强度,一般只适用于干燥环境,不宜用于潮湿环境与水中;那么水硬性胶凝材料则只能适用于潮湿环境与水中。",[192,193],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":195,"libraryId":5,"type":114,"typeLabel":115,"stem":196,"options":197,"answer":121,"analysis":37},1163303,"用人单位和劳动者之间订立的劳动合同可以采用书面或口头形式。",[198,199],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":201,"libraryId":5,"type":114,"typeLabel":115,"stem":202,"options":203,"answer":121,"analysis":37},1163304,"《劳动合同法》的立法目的,是为了完善劳动合同制度,建立和维护适应社会主义市场经济的劳动制度,明确劳动合同双方当事人的权利和义务,保护劳动者的合法权益,构建和发展和谐稳定的劳动关系。",[204,205],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":207,"libraryId":5,"type":114,"typeLabel":115,"stem":208,"options":209,"answer":121,"analysis":37},1163305,"施工技术交底的目的是使现场施工人员对安全生产有所了解,最大限度避免安全事故的发生。",[210,211],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":213,"libraryId":5,"type":114,"typeLabel":115,"stem":214,"options":215,"answer":119,"analysis":37},1163306,"建设工程施工前,施工单位负责该项目管理的施工员应当对有关安全施工的技术要求向施工作业班组、作业人员做出详细说明,并由双方签字确认。",[216,217],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":219,"libraryId":5,"type":114,"typeLabel":115,"stem":220,"options":221,"answer":121,"analysis":37},1163307,"生产经营单位发生生产安全事故后,事故现场相关人员应当立即报告施工项目经理。",[222,223],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":225,"libraryId":5,"type":114,"typeLabel":115,"stem":226,"options":227,"answer":119,"analysis":37},1163308,"负有安全生产监督管理职责的部门对有根据认为不符合保障安全生产的国家标准或者行业标准的设施、设备、器材可予以查封或者扣押,并应当在15日内依法做出处理决定。",[228,229],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":231,"libraryId":5,"type":114,"typeLabel":115,"stem":232,"options":233,"answer":121,"analysis":37},1163309,"生产经营单位临时聘用的钢结构焊接工人不属于生产经营单位的从业人员,所以不享有相应的从业人员应享有的权利。",[234,235],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":237,"libraryId":5,"type":114,"typeLabel":115,"stem":238,"options":239,"answer":121,"analysis":37},1163310,"从业人员发现直接危及人身安全的紧急情况时,未经主管单位允许停止作业后,生产经营单位有权降低其工资、福利等待遇。",[240,241],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":243,"libraryId":5,"type":114,"typeLabel":115,"stem":244,"options":245,"answer":121,"analysis":37},1163311,"生产经营单位的特种作业人员必须按照国家有关规定经生产经营单位组织的安全作业培训,方可上岗作业。",[246,247],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":249,"libraryId":5,"type":114,"typeLabel":115,"stem":250,"options":251,"answer":121,"analysis":37},1163312,"危险物品的生产、经营、储存单位以及矿山、建筑施工单位的主要负责人和安全生产管理人员，应当缴费参加由有关部门对其安全生产知识和管理能力考核合格后方可任职。",[252,253],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":255,"libraryId":5,"type":114,"typeLabel":115,"stem":256,"options":257,"answer":121,"analysis":37},1163313,"群防群治制度是建筑生产中最基本的安全管理制度,是所有安全规章制度的核心,是安全第一、预防为主方针的具体体现。",[258,259],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":261,"libraryId":5,"type":114,"typeLabel":115,"stem":262,"options":263,"answer":121,"analysis":37},1163314,"《建筑法》第36条规定:建筑工程安全生产管理必须坚持安全第一、预防为主的方针。其中安全第一是安全生产方针的核心。",[264,265],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":267,"libraryId":5,"type":114,"typeLabel":115,"stem":268,"options":269,"answer":121,"analysis":37},1163315,"工程施工分包是指承包人将中标工程项目分解后分别发包给具有相应资质的企业完成。",[270,271],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":273,"libraryId":5,"type":114,"typeLabel":115,"stem":274,"options":275,"answer":119,"analysis":37},1163316,"《建筑法》的立法目的在于加强对建筑活动的监督管理,维护建筑市场秩序,保证建筑工程的质量和安全,促进建筑业健康发展。",[276,277],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":279,"libraryId":5,"type":114,"typeLabel":115,"stem":280,"options":281,"answer":119,"analysis":37},1163317,"在我国的建设法规的五个层次中,法律效力的层级是上位法高于下位法,具体表现为:建设法律→建设行政法规→建设部门规章→地方性建设法规→地方建设规章。",[282,283],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":285,"libraryId":5,"type":114,"typeLabel":115,"stem":286,"options":287,"answer":119,"analysis":37},1163318,"《安全生产法》规定,生产经营单位与从业人员订立的劳动合同,应当载明依法为从业人员办理工伤社会保险的事项。",[288,289],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":291,"libraryId":5,"type":114,"typeLabel":115,"stem":292,"options":293,"answer":121,"analysis":37},1163319,"《安全生产法》第72条规定:有关地方人民政府和负有安全生产监督管理职责的部门负责人接到特别重大生产安全事故报告后,应当立即赶到事故现场,组织事故抢救。",[294,295],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":297,"libraryId":5,"type":114,"typeLabel":115,"stem":298,"options":299,"answer":121,"analysis":37},1163320,"某施工工地脚手架倒塌，造成3人死亡8人重伤，根据《生产安全事故报告和调查处理条例》规定，该事故等级属于一般事故。",[300,301],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":303,"libraryId":5,"type":114,"typeLabel":115,"stem":304,"options":305,"answer":121,"analysis":37},1163321,"国务院负责安全生产监督管理的部门对全国建设工程安全生产工作实施综合监督管理。",[306,307],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":309,"libraryId":5,"type":114,"typeLabel":115,"stem":310,"options":311,"answer":119,"analysis":37},1163322,"建筑业企业资质,是指建筑业企业的建设业绩、人员素质、管理水平、资金数量、技术装备等的总称。",[312,313],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":315,"libraryId":5,"type":114,"typeLabel":115,"stem":316,"options":317,"answer":121,"analysis":37},1163323,"省、自治区、直辖市以及省会城市、自治区首府、地级市均有立法权。",[318,319],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":321,"libraryId":5,"type":114,"typeLabel":115,"stem":322,"options":323,"answer":121,"analysis":37},1163324,"胡克定律表明,杆件的纵向变形与轴力及杆长成正比,与横截面面积成反比。",[324,325],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":327,"libraryId":5,"type":114,"typeLabel":115,"stem":328,"options":329,"answer":119,"analysis":37},1163325,"杆件的纵向变形是一绝对量,不能反映杆件的变形程度。",[330,331],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":333,"libraryId":5,"type":114,"typeLabel":115,"stem":334,"options":335,"answer":121,"analysis":37},1163326,"刚度是指结构或构件抵抗破坏的能力。",[336,337],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":339,"libraryId":5,"type":114,"typeLabel":115,"stem":340,"options":341,"answer":121,"analysis":37},1163327,"矩心到力的作用点的距离称为力臂。",[342,343],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":345,"libraryId":5,"type":114,"typeLabel":115,"stem":346,"options":347,"answer":121,"analysis":37},1163328,"改变力的方向,力的作用效果不会改变。",[348,349],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":351,"libraryId":5,"type":114,"typeLabel":115,"stem":352,"options":353,"answer":119,"analysis":37},1163329,"焊接的质量取决于焊接工艺、焊接材料及钢的焊接性能。",[354,355],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":357,"libraryId":5,"type":114,"typeLabel":115,"stem":358,"options":359,"answer":121,"analysis":37},1163330,"混合砂浆强度较高,耐久性较好,但流动性和保水性较差,可用于砌筑较干燥环境下的砌体。",[360,361],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":363,"libraryId":5,"type":114,"typeLabel":115,"stem":364,"options":365,"answer":119,"analysis":37},1163331,"水泥是混凝土组成材料中最重要的材料,也是成本支出最多的材料,更是影响混凝土强度、耐久性最重要的影响因素。",[366,367],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},{"id":369,"libraryId":5,"type":114,"typeLabel":115,"stem":370,"options":371,"answer":121,"analysis":37},1163332,"在建设工程竣工验收后,在规定的保修期限内,因勘察、设计、施工、材料等原因造成的质量缺陷,应当由责任单位负责维修、返工或更换。",[372,373],{"key":20,"text":119,"correct":35},{"key":24,"text":121,"correct":22},{"id":375,"libraryId":5,"type":114,"typeLabel":115,"stem":376,"options":377,"answer":119,"analysis":37},1163333,"施工项目是指建筑企业自施工投标开始到保修期满为止的全部过程中完成的项目。",[378,379],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":35},[381,385,388,391,394,397],{"id":382,"name":383,"category":7,"favorite":384},1,"领导干部任职前廉政法规知识测试题",92,{"id":386,"name":387,"category":7,"favorite":382},595,"建筑结构与设备",{"id":389,"name":390,"category":7,"favorite":382},715,"招标采购专业知识与法律法规",{"id":392,"name":393,"category":7,"favorite":382},848,"市政方向-通用基础",{"id":395,"name":396,"category":7,"favorite":8},534,"BIM工程师",{"id":398,"name":396,"category":7,"favorite":8},535]