[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1163373":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1163373,824,3,"判断题","劳动定额一般采用工作时间消耗量来计算人工工日消耗的数量,所以其主要表现形式是产量定额。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"通用基础","建筑工程",0]