[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162895":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1162895,823,3,"判断题","项目材料、设备的配置计划按用途划分,可分为:需用计划、申请计划、采购（加工订货）计划、供应计划、储备计划。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"岗位技能","建筑工程",0]