[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162818":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1162818,823,3,"判断题","在软件的材料验收过程中必须采取直接在验收单中填写验收单的验收方式。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"岗位技能","建筑工程",0]