[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162791":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162791,823,2,"多选题","以下属于投标单位计算标价主要依据的有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","招标文件",true,{"key":16,"text":17,"correct":14},"B","施工图纸和工程量清单",{"key":19,"text":20,"correct":14},"C","施工组织设计",{"key":22,"text":23,"correct":14},"D","材料预算价格",{"key":25,"text":26,"correct":27},"E","项目总体价格",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]