[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162775":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162775,823,2,"多选题","采用直接计算法计算施工项目某种材料计划需用量时,可采用的定额为( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","材料消耗施工定额",true,{"key":16,"text":17,"correct":14},"B","概算定额",{"key":19,"text":20,"correct":21},"C","月度计划",false,{"key":23,"text":24,"correct":21},"D","旬计划",{"key":26,"text":27,"correct":21},"E","预算定额","AB","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]