[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162771":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162771,823,2,"多选题","按材料计划涵盖的时间段划分,可分为( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","年度计划",true,{"key":16,"text":17,"correct":14},"B","季度计划",{"key":19,"text":20,"correct":14},"C","月度计划",{"key":22,"text":23,"correct":24},"D","旬计划",false,{"key":26,"text":27,"correct":14},"E","追加计划","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]