[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162766":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162766,823,2,"多选题","材料采购方案的优选原则是( )之和最低。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","采购费",true,{"key":16,"text":17,"correct":14},"B","储存费",{"key":19,"text":20,"correct":21},"C","损耗费",false,{"key":23,"text":24,"correct":21},"D","运输费",{"key":26,"text":27,"correct":21},"E","二次倒运费","AB","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]