[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162717":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162717,823,2,"多选题","工程成本核算的分析方法有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","比较法",true,{"key":16,"text":17,"correct":14},"B","因素分析法",{"key":19,"text":20,"correct":14},"C","差额计算法",{"key":22,"text":23,"correct":14},"D","比率法",{"key":25,"text":26,"correct":27},"E","指标分析法",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]