[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162705":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162705,823,2,"多选题","现场余料管理的内容主要有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","各项目经理部材料人员,在工程接近收尾阶段,要经常检查掌握现场余料情况",true,{"key":16,"text":17,"correct":14},"B","企业或工程项目应建立统一的计价方法,以利剩余材料的再利用",{"key":19,"text":20,"correct":14},"C","应做好余料的回收、整修、退库和处理",{"key":22,"text":23,"correct":24},"D","对于不再使用且已判定为废料的,应按照项目经理的要求处理",false,{"key":26,"text":27,"correct":14},"E","鼓励剩余材料的修复利用","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]