[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162555":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1162555,823,1,"单选题","根据构成工程成本的各个要素,按编制施工图预算的方法确定的工程成本是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预算成本",true,{"key":16,"text":17,"correct":18},"B","计划成本",false,{"key":20,"text":21,"correct":18},"C","实际成本",{"key":23,"text":24,"correct":18},"D","统计成本","",{"id":6,"name":27,"category":28,"favorite":29},"岗位技能","建筑工程",0]