[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-822-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},822,"(材料员)专业管理实务 岗位知识","建筑工程",0,5,50,1266,[13,34,46,58,70,82,92,104,113,125,137,149,161,173,185,197,207,219,231,243,255,267,279,291,303,315,327,336,348,360,372,384,396,408,420,432,444,455,467,476,488,500,512,524,533,542,552,564,576,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1161455,1,"单选题","如果限额领料单不能及时下达或修正，应由工长填制、项目主管人员审批“工程t借用料单\\\"并凭此发放材料，限额领料单应在（ ）d内应补齐并交到材料部门作为《式发料凭证，否则将停止发料。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":26},"B","3",true,{"key":28,"text":29,"correct":22},"C","5",{"key":31,"text":32,"correct":22},"D","7","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1161456,"当国家规定或合同约定应对材料进行见证检测时或对材料的质量发生争议时，应进行见证检测。见证取样和送检的比例不得低于有关技术标准中规定应取样数量的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"20%",{"key":24,"text":41,"correct":26},"30%",{"key":28,"text":43,"correct":22},"40％",{"key":31,"text":45,"correct":22},"D50％",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1161457,"各级工程质量监督检测机构中，有CMA章，即计量认证，则（ ）审查",[50,52,54,56],{"key":20,"text":51,"correct":22},"半年",{"key":24,"text":53,"correct":26},"一年",{"key":28,"text":55,"correct":22},"二年",{"key":31,"text":57,"correct":22},"四年",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1161458,"土工模袋的最大填充厚度不超过（ ）mm",[62,64,66,68],{"key":20,"text":63,"correct":22},"200",{"key":24,"text":65,"correct":22},"300",{"key":28,"text":67,"correct":22},"400",{"key":31,"text":69,"correct":26},"500",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1161459,"主要反映周转材料投入和使用的经济效果及其摊销状况的核算是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"会计核算",{"key":24,"text":77,"correct":22},"统计核算",{"key":28,"text":79,"correct":22},"业务核算",{"key":31,"text":81,"correct":22},"会计业务核算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1161460,"生产厂应根据产量和生产设备条件，将混凝土外加剂分批编号，掺量大于1％（含1％）同品种的外加剂每一批次为（ ）t。",[86,88,90,91],{"key":20,"text":87,"correct":22},"50",{"key":24,"text":89,"correct":26},"100",{"key":28,"text":63,"correct":22},{"key":31,"text":69,"correct":22},{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":28,"analysis":33},1161461,"常用做屋面或地下防水工程的是（ ）",[96,98,100,102],{"key":20,"text":97,"correct":22},"石油沥青纸胎油毡",{"key":24,"text":99,"correct":22},"石油沥青玻璃布油毡",{"key":28,"text":101,"correct":26},"石油沥青玻纤胎油毡",{"key":31,"text":103,"correct":22},"石油沥青麻布胎油毡",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1161462,"砂、石应按同产地同规格分批检验，用小型工具运输的，以（ ）m3为一批，不足数量以一批论。",[108,109,110,111],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":112,"correct":22},"600",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":20,"analysis":33},1161463,"周转材料的实物量承包管理的定包数量的确定中，模板用量的确定的定额损耗率一般不超过计划用量的（ ）。",[117,119,121,123],{"key":20,"text":118,"correct":26},"1％",{"key":24,"text":120,"correct":22},"2％",{"key":28,"text":122,"correct":22},"3％",{"key":31,"text":124,"correct":22},"4％",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},1161464,"下列管理功能中主要用于对材料使用情况的查询、对比，以及按类汇总的是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"财务管理",{"key":24,"text":132,"correct":26},"材料成本分析管理",{"key":28,"text":134,"correct":22},"预算计划管理",{"key":31,"text":136,"correct":22},"基础数据管理",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":20,"analysis":33},1161465,"水泥、镀锌钢管适宜存放在（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":26},"仓库",{"key":24,"text":144,"correct":22},"库棚",{"key":28,"text":146,"correct":22},"料场",{"key":31,"text":148,"correct":22},"露天",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},1161466,"下列属于混凝土工程用周转材料的是（ ）",[153,155,157,159],{"key":20,"text":154,"correct":26},"钢模板、木模板",{"key":24,"text":156,"correct":22},"脚手架、跳板",{"key":28,"text":158,"correct":22},"安全网、挡土板",{"key":31,"text":160,"correct":22},"钢模板、胶合板",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},1161467,"材料消耗过程中，对构成工程实体的材料进行的核算活动称为（ ）",[165,167,169,171],{"key":20,"text":166,"correct":26},"材料耗用",{"key":24,"text":168,"correct":22},"材料盘点",{"key":28,"text":170,"correct":22},"c材料点交",{"key":31,"text":172,"correct":22},"材料分析",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1161468,"周转材料的特征不包括（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":26},"用量较小",{"key":24,"text":180,"correct":22},"使用期短",{"key":28,"text":182,"correct":22},"收发频繁，易于损耗",{"key":31,"text":184,"correct":22},"经常需要补充和更换",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},1161469,"普通碳素钢随牌号降低，钢材（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"强度提高、韧性提高",{"key":24,"text":192,"correct":22},"强度降低、伸长率降低",{"key":28,"text":194,"correct":22},"强度提高、伸长率降低",{"key":31,"text":196,"correct":26},"强度降低、伸长率提高",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1161470,"周转材料费用测算公式中管理费和保养费均按周转材料原值的一定比例计取，般不超过原值的（ ）。",[201,202,204,206],{"key":20,"text":118,"correct":22},{"key":24,"text":203,"correct":26},"2%",{"key":28,"text":205,"correct":22},"3%",{"key":31,"text":124,"correct":22},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":28,"analysis":33},1161471,"下列哪一种是反映仓库储存能力的面积（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"建筑面积",{"key":24,"text":214,"correct":22},"使用面积",{"key":28,"text":216,"correct":26},"有效面积",{"key":31,"text":218,"correct":22},"总面积",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1161472,"以下哪项不属于限额领料的确定依据（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"技术节约措施新规定的单方用料量",{"key":24,"text":226,"correct":26},"项目进度计划",{"key":28,"text":228,"correct":22},"正确的工程量",{"key":31,"text":230,"correct":22},"定额的正确选用",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},1161473,"在绝热要求较高的维护结构上应使用（ ）",[235,237,239,241],{"key":20,"text":236,"correct":22},"混凝土小型空心砌块",{"key":24,"text":238,"correct":22},"加气混凝土砌块",{"key":28,"text":240,"correct":22},"粉煤灰砌块",{"key":31,"text":242,"correct":26},"轻骨料混凝土小型空心砌块",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1161474,"材料入库凭证不包括（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"验收单",{"key":24,"text":250,"correct":22},"入库单",{"key":28,"text":252,"correct":22},"加工单",{"key":31,"text":254,"correct":26},"订货单",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},1161475,"对首次使用的外加剂或使用间断三个月以上时，厂方必须提供有效的（ ）",[259,261,263,265],{"key":20,"text":260,"correct":22},"合格证",{"key":24,"text":262,"correct":22},"出厂检验报告",{"key":28,"text":264,"correct":26},"型式检验报告",{"key":31,"text":266,"correct":22},"使用说明书",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1161476,"对于调往项目以外其他部门或其他项目的材料，凭施工项目材料主管人签发或上级主管部门签发、项目材料主管人员核准的（ ）调拨材料。",[271,273,275,277],{"key":20,"text":272,"correct":22},"工程暂设用料申请单",{"key":24,"text":274,"correct":22},"工程暂供用料单",{"key":28,"text":276,"correct":22},"限额领料单",{"key":31,"text":278,"correct":26},"材料调拨单",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1161477,"下列选项中，不属于周转材料按使用对象分类的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"混凝土工程用周转材料",{"key":24,"text":286,"correct":22},"结构及装修工程用周转材料",{"key":28,"text":288,"correct":22},"安全防护用周转材料",{"key":31,"text":290,"correct":26},"钢制品",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1161478,"偏心受压构件进行钢筋代换时，应按（ ）分别代换",[295,297,299,301],{"key":20,"text":296,"correct":22},"截面面积",{"key":24,"text":298,"correct":22},"整个截面配筋量",{"key":28,"text":300,"correct":22},"截面承载力",{"key":31,"text":302,"correct":26},"受力面",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1161479,"下列选项中，不属于通用硅酸盐水泥的是（ ）",[307,309,311,313],{"key":20,"text":308,"correct":26},"快硬硅酸盐水泥",{"key":24,"text":310,"correct":22},"矿渣硅酸盐水泥",{"key":28,"text":312,"correct":22},"火山灰质硅酸盐水泥",{"key":31,"text":314,"correct":22},"粉煤灰硅酸盐水泥",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1161480,"库存材料的盘点方法有（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":26},"定期盘点法",{"key":24,"text":322,"correct":22},"“四包”管理法",{"key":28,"text":324,"correct":22},"“四统一”管理法",{"key":31,"text":326,"correct":22},"跟踪管理法",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1161481,"租赁中的管理费和保养费均按周转材料原值的一定比例计取，一般不超过原值的（ ）。",[331,332,333,334],{"key":20,"text":120,"correct":26},{"key":24,"text":122,"correct":22},{"key":28,"text":124,"correct":22},{"key":31,"text":335,"correct":22},"5％",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1161482,"ABC分类法将储备材料划分为 A. B.C三大类，其中A类材料金额约占储备金额的（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"5～15",{"key":24,"text":343,"correct":22},"15～25",{"key":28,"text":345,"correct":22},"25～45",{"key":31,"text":347,"correct":26},"60～80",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1161483,"混凝土外加剂的取样量规定，每一批取样量不少于（ ）t水泥所需用的外加剂量。",[352,354,356,358],{"key":20,"text":353,"correct":26},"0.2",{"key":24,"text":355,"correct":22},"0.3",{"key":28,"text":357,"correct":22},"0.4",{"key":31,"text":359,"correct":22},"0.5",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},1161484,"下列选项中，不属于租赁管理方法的是（ ）",[364,366,368,370],{"key":20,"text":365,"correct":22},"周转材料的租用",{"key":24,"text":367,"correct":26},"租赁效果考核",{"key":28,"text":369,"correct":22},"周转材料的验收和赔偿",{"key":31,"text":371,"correct":22},"结算",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1161485,"针片状颗粒含量是（ ）进场外观验收的项目。",[376,378,380,382],{"key":20,"text":377,"correct":22},"砂",{"key":24,"text":379,"correct":26},"岩石颗粒",{"key":28,"text":381,"correct":22},"水泥",{"key":31,"text":383,"correct":22},"陶粒",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},1161486,"检查材料的供应量是保证生产完成和施工顺利进行的重要条件，供应量（ ）会影响施工生产的正常进行。",[388,390,392,394],{"key":20,"text":389,"correct":22},"等额",{"key":24,"text":391,"correct":22},"超额",{"key":28,"text":393,"correct":26},"不足",{"key":31,"text":395,"correct":22},"足够",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":28,"analysis":33},1161487,"储备实物量的核算是对实物（ ）的核算。",[400,402,404,406],{"key":20,"text":401,"correct":22},"期末库存量",{"key":24,"text":403,"correct":22},"平均材料消耗量",{"key":28,"text":405,"correct":26},"周转速度",{"key":31,"text":407,"correct":22},"综合单价",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1161489,"周转材料的核算是以（ ）为主要内容，核算其周转材料的费用收入与支出的差异。",[412,414,416,418],{"key":20,"text":413,"correct":22},"施工图",{"key":24,"text":415,"correct":22},"概算定额",{"key":28,"text":417,"correct":22},"预算定额",{"key":31,"text":419,"correct":26},"价值量",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1161490,"材料预算价格是（ ）的。",[424,426,428,430],{"key":20,"text":425,"correct":22},"全国统一",{"key":24,"text":427,"correct":26},"地区性",{"key":28,"text":429,"correct":22},"企业性",{"key":31,"text":431,"correct":22},"项目自定",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1161491,"根据“建筑安装工程费用组成”的规定，下列费用（ ）不属于直接工程费。",[436,438,440,442],{"key":20,"text":437,"correct":22},"人工费",{"key":24,"text":439,"correct":26},"措施费",{"key":28,"text":441,"correct":22},"施工机具使用费",{"key":31,"text":443,"correct":22},"材料费",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},1161492,"为完成工程项目施工，发生于该工程施工前和施工过程中非工程实体项目的费用是（ ）",[448,450,452,453],{"key":20,"text":449,"correct":22},"企业管理费",{"key":24,"text":451,"correct":22},"直接工程费",{"key":28,"text":439,"correct":26},{"key":31,"text":454,"correct":22},"规费",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},1161493,"工程材料成本的盈亏主要核算（ ）",[459,461,463,465],{"key":20,"text":460,"correct":26},"量差和价差",{"key":24,"text":462,"correct":22},"采购费和储存费",{"key":28,"text":464,"correct":22},"运输费和采购费",{"key":31,"text":466,"correct":22},"仓储费和损耗费",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},1161494,"生产工人劳动保护费属于（ ）",[471,472,473,474],{"key":20,"text":437,"correct":26},{"key":24,"text":443,"correct":22},{"key":28,"text":439,"correct":22},{"key":31,"text":475,"correct":22},"间接费",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1161495,"材料供应量等于材料消耗定额乘以（ ），并考虑库存、合理储备、综合利用等因素平衡确定。",[480,482,484,486],{"key":20,"text":481,"correct":22},"增加额",{"key":24,"text":483,"correct":22},"减少额",{"key":28,"text":485,"correct":26},"工程量",{"key":31,"text":487,"correct":22},"完成量",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1161496,"某建筑项目的年合同造价为2160万元，企业物资部门按概算每万元10t采购水泥。由同一个水泥厂供应，合同规定水泥厂按每次催货要求时间发货。项目物资部门提出了三个方案：A1方案，每月交货一次；A2方案，每二月交货一次；A3方案，每三月交货次。根据历史资料得知，每次催货费用为C=5000元；仓库保管费率A为储存材料费的4％。水泥单价（含运费）为360元\u002Ft。优选方案的计算如下： ①A1方案的计算：采购次数为12月÷1月一12（次）；每次采购数量为21600÷12=1800（t）；保管费+采购费=1800×360÷2×0.04+12×5000=12960+60000=72960（元）。 ②A2方案的计算：采购次数为12月÷2月=6（次）；每次采购数量为21600÷6=3600（t）;保管费+采购费=3600×360÷2×0.04+6×5000=25920+30000=55920（元）。 ③A3方案的计算：采购次数为12月÷3月=4（次）；每次采购数量为21600÷4=5400（t）；保管费+采购费=5400×360÷2×0.04+4×5000=38880十20000=58880（元）。 根据以上背景资料，回答下列问题： 按最优采购批量计算，该项目的年水泥费用是（ ）元。",[492,494,496,498],{"key":20,"text":493,"correct":22},"7776000",{"key":24,"text":495,"correct":26},"7806000",{"key":28,"text":497,"correct":22},"7961520",{"key":31,"text":499,"correct":22},"8961520",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1161497,"适用于与主件配套使用并独立计价的零配件的费用摊销方法是（ ）",[504,506,508,510],{"key":20,"text":505,"correct":22},"分布摊销法",{"key":24,"text":507,"correct":26},"一次摊销法",{"key":28,"text":509,"correct":22},"“五五”摊销法",{"key":31,"text":511,"correct":22},"期限摊销法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1161498,"检查考核材料的供应计划的执行情况，主要是检查材料的（ ）执行情况，它反映了材料对生产的保证程度。",[516,518,520,522],{"key":20,"text":517,"correct":22},"供应",{"key":24,"text":519,"correct":22},"收入",{"key":28,"text":521,"correct":26},"计划",{"key":31,"text":523,"correct":22},"储备",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1161499,"由于会计记录具有连续性、系统性、综合性的特点，因此施工成本分析的重要依据是（ ）。",[528,529,530,531],{"key":20,"text":75,"correct":26},{"key":24,"text":79,"correct":22},{"key":28,"text":77,"correct":22},{"key":31,"text":532,"correct":22},"计划核算",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1161500,"计量尺度比会计宽，可以用货币计算，也可以用实物或劳动量计量是（ ）。",[537,538,539,540],{"key":20,"text":75,"correct":22},{"key":24,"text":79,"correct":22},{"key":28,"text":77,"correct":26},{"key":31,"text":541,"correct":22},"材料成本差异",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},1161501,"下列选项（ ）属于建筑安装企业组织施工生产和经营管理的企业管理费。",[546,548,549,550],{"key":20,"text":547,"correct":26},"职工教育经费",{"key":24,"text":439,"correct":22},{"key":28,"text":441,"correct":22},{"key":31,"text":551,"correct":22},"利润",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1161502,"通常按实际成本计算价格可采用（ ）方法",[556,558,560,562],{"key":20,"text":557,"correct":26},"先进先出法",{"key":24,"text":559,"correct":22},"后进先出法",{"key":28,"text":561,"correct":22},"预算价格法",{"key":31,"text":563,"correct":22},"成本核算法",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},1161503,"材料采购核算，是以材料采购（ ）为基础，与实际采购成本相比较，核算其本降低或超耗的程度。",[568,570,572,574],{"key":20,"text":569,"correct":22},"概算成本",{"key":24,"text":571,"correct":22},"计划成本",{"key":28,"text":573,"correct":26},"预算成本",{"key":31,"text":575,"correct":22},"统计成本",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1161504,"可以对个别的经济业务进行单项核算的是（ ）。",[580,581,582,583],{"key":20,"text":75,"correct":22},{"key":24,"text":79,"correct":26},{"key":28,"text":77,"correct":22},{"key":31,"text":584,"correct":22},"年度核算",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1161505,"当工程结算时，建筑企业应审核单价是否符合国家或地方规定的价格，如无规定的，应按（ ）结算。",[589,591,593,595],{"key":20,"text":590,"correct":22},"交易习惯",{"key":24,"text":592,"correct":26},"合同规定的价格",{"key":28,"text":594,"correct":22},"实际成本",{"key":31,"text":596,"correct":22},"经验价格",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]