[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-822-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},822,"(材料员)专业管理实务 岗位知识","建筑工程",0,23,50,1266,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1162364,3,"判断题","施工现场存放大量的易燃易爆物品时，应由专人进行看管。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1162365,"外包队使用企业工具为有偿使用，一律应实行购买和租赁的办法。（ ）",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1162366,"材料采购实际成本时按实际价格事后计算的预算成本支出。（ ）",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1162367,"一次摊销法适用于价值较高、使用期限较长的材料。（ ）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1162368,"业务核算计量尺度比会计宽，可以用货币计算，也可以用实物或劳动量计算。（ ）",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1162369,"税金是指政府和有关权力部门规定必须缴纳的费用。（ ）",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1162370,"某种材料节约（超耗率）正百分数为节约率，负百分数为超耗率。（ ）",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1162371,"建筑安装工程费用由直接费、间接费、利润和税金组成。（ ）",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1162372,"检查考核材料供应计划的执行情况，主要是检查材料的收入执行情况。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1162373,"工程设备成本核算，首先要将工程的预算成本同实际成本比较，检查工程成本时节约还是超支。（ ）",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1162374,"企业为了防止材料积压或不足，保证生产及加速资金周转，必须经常检查材料储备定额的执行情况，分析是否超储或不足。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1162375,"核算一项工程使用多种材料的消耗情况时，可以直接相加进行考核。（ ）",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1162376,"材料的实际价格是按采购过程中所发生的实际成本计算的单价。（ ）",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1162377,"材料费包括材料原价、材料运杂费、运输损耗费、采购及保管费。（ ）",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1162378,"加权平均法指同一种材料在发生不同实际成本时，按加权平均法求得的平均单价。（ ）",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1162379,"地区材料预算价格规定的材料价格与实际采购供应材料价格之间的差称为“量差”。（ ）",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1162380,"直接费由人工费、材料费和机械费组成。（ ）",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1162381,"税金以税前总价为基数。（ ）",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1162382,"工程材料费的核算，主要依据是直接工程费和地区材料预算价格。（ ）",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1162383,"材料价差的发生若由建设单位供料，按地区预算价格向施工单位结算，价格差异发生在施工单位，由建设单位负责核算。（ ）",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1162384,"直接计算法计算得到企业材料需用量是比较准确的方法。（ ）",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1162385,"直接计算法适用于某些不便于制订消耗定额的材料，或耗用量不大的辅助材料。（ ）",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1162386,"安全防护用具属于ABC分类法中的B类物资。（ ）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1162387,"周转材料的损耗率常用用统计法和观测法来确定。（ ）",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1162388,"一些通用性材料，在工程进行初期阶段，实际需用量要略小于计划需用量。（ ）",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1162390,"编制材料计划要力求保证供应，不留余地，利于节约。（ ）",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1162391,"建筑企业的材料供应目录是固定不变的。（ ）",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1162392,"试验法是通过专门的仪器和设备在施工现场确定材料消耗定额的一种方法。（ ）",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1162393,"根据材料使用次数的不同，建筑安装材料分为非周转性材料和周转性材料。（ ）",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1162394,"最基本的材料计划是材料需用计划。（ ）",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1162395,"考虑到“工完料清场地净”，材料实际需用量要略小于计划需用量。（ ）",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1162396,"年度计划必须与企业的年度施工生产计划任务密切结合。（ ）",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1162397,"项目材料、设备的配置计划按用途划分，可分为：需用计划、申请计划、采购（加工订货）计划、供应计划、储备计划。（ ）",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1162398,"室内、外各类防水材料属于ABC分类法中的A类物资。（ ）",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1162399,"当材料需用量不具备直接计算的条件时，可采用间接计算法进行计算。（ ）",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1162400,"工具需用量一般按照不同种类、规格和不同用途分别计算。（ ）",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1162401,"材料需用计划通常以单位工程为对象，结合材料消耗定额，逐项计算需用材料的品种、规格、质量、数量、最终汇总成实际需用数量。（ ）",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1162402,"A类物资由公司负责供应，B、C类物资由项目部负责供应。（ ）",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1162403,"材料供应计划除包括供应材料的品种、规格、质量、数量、使用项目外，还应包括供应时间。（ ）",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1162404,"由于施工预算编制较细，一般应高于施工图预算。（ ）",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1162405,"材料的年度计划是企业控制成本，编制资金计划和考核物资部门全年工作的主要依据。（ ）",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1162406,"材料季度计划是年度计划的滚动计划和分解计划。（ ）",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1162407,"材料供应目录是编制材料供应计划和组织物资采购的重要依据。（ ）",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1162408,"对于一些通用性材料，在工程进行初期阶段，考虑到可能出现的施工进度超额因一般都略加大储备，其实际需用量就略大于计划需用量。（ ）",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1162409,"材料消耗量汇总表是编制材料需用量计划的依据。（ ）",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1162410,"B、C类物资均可不进行物资供方评定工作。（ ）",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1162411,"材料采购信息，首先应具有具有一定的深度，第二具有可靠性，有可靠的原始数据，第三是及时性。（ ）",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1162412,"没有良好的材料供应，就不可能形成有实力的建筑企业。（ ）",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1162413,"在中华人民共和国境内进行大型基础设施、公用事业等关系社会公共利益、公众安全的项目的材料采购，必须进行招标。（ ）",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1162414,"当同一种材料，可供资源部门较多且价、质量、服务差异较时，要进行比较判断。（ ）",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]