[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-822-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":718},{"id":5,"name":6,"category":7,"favorite":8},822,"(材料员)专业管理实务 岗位知识","建筑工程",0,16,50,1266,[13,38,53,68,83,98,113,125,140,154,168,182,195,210,224,237,251,263,274,288,302,317,327,341,355,369,383,397,411,426,437,452,466,480,495,509,523,537,551,565,579,593,607,621,635,649,664,678,692,703],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1162012,2,"多选题","工程成本核算分析的比较法的应用，通常有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","实际指标与平均指标对比",false,{"key":24,"text":25,"correct":26},"B","实际指标与目标指标对比",true,{"key":28,"text":29,"correct":26},"C","本期实际指标与上期实际指标对比",{"key":31,"text":32,"correct":26},"D","与本行业平均水平、先进水平对比",{"key":34,"text":35,"correct":22},"E","与同期平均水平对比","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1162013,"某种材料检查消耗情况时，正确的选项有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"某种材料节约（超耗量）一某种材料定额耗用量一该项材料实际耗用量",{"key":24,"text":45,"correct":26},"正百分数为节约率",{"key":28,"text":47,"correct":26},"负百分数为超耗率",{"key":31,"text":49,"correct":22},"正数表示超耗",{"key":34,"text":51,"correct":22},"负数表示节约","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1162014,"检验批质量由（ ）组织施工单位项目专业质量检查员等进行验收。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"监理工程师",{"key":24,"text":60,"correct":22},"专业监理工程师",{"key":28,"text":62,"correct":26},"建设单位项目专业技术负责人",{"key":31,"text":64,"correct":22},"项目经理",{"key":34,"text":66,"correct":22},"施工单位专业技术负责人","AC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1162016,"基层组织材料计划员要做到“五核实、四查清、三依据、两制度、一落实”，四查清是指（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"查耗用量是否超计划供应",{"key":24,"text":75,"correct":26},"查需用量与预算数量是否相符",{"key":28,"text":77,"correct":26},"查内部调度平衡材料的落实",{"key":31,"text":79,"correct":26},"查需要采购、储备材料的库存情况",{"key":34,"text":81,"correct":22},"查计划需用量是否落实到单位工程和个人（施工班组）","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1162017,"单位工程施工机械需用量计算是根据（ ）编制的。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"单位工程工程量",{"key":24,"text":90,"correct":22},"设计方案",{"key":28,"text":92,"correct":26},"施工方案",{"key":31,"text":94,"correct":26},"施工机具类型",{"key":34,"text":96,"correct":26},"定额机械台班用量","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1162018,"下列物资中，属于B类物资的有（ ）",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"防水材料",{"key":24,"text":105,"correct":26},"保温材料",{"key":28,"text":107,"correct":22},"装饰材料",{"key":31,"text":109,"correct":26},"地方材料",{"key":34,"text":111,"correct":22},"机电材料","ABD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":82,"analysis":37},1162019,"下列物资中，属于A类物资的有（ ）",[117,119,121,123,124],{"key":20,"text":118,"correct":26},"钢材",{"key":24,"text":120,"correct":26},"水泥",{"key":28,"text":122,"correct":26},"木材",{"key":31,"text":107,"correct":26},{"key":34,"text":103,"correct":22},{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1162020,"企业一级材料计划员在编制和执行计划中应做到“把两关、三对口、四核算、五勤、六有数\\\"，四核算是指（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":26},"核算分部、分项工程材料需用量",{"key":24,"text":132,"correct":26},"核算单位工程材料需用量",{"key":28,"text":134,"correct":26},"核算大、小厂水泥需用量",{"key":31,"text":136,"correct":22},"核算单位工程主要材料、特殊材料的总需用数量",{"key":34,"text":138,"correct":26},"核算木材（分为正材、副材）需用量","ABCE",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":52,"analysis":37},1162021,"材料消耗定额的制定方法比较常用的有（ ）。",[144,146,148,150,152],{"key":20,"text":145,"correct":26},"计算法",{"key":24,"text":147,"correct":26},"统计分析法",{"key":28,"text":149,"correct":26},"经验估计法",{"key":31,"text":151,"correct":22},"间接计算法",{"key":34,"text":153,"correct":22},"现场测定法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":52,"analysis":37},1162022,"下列（ ）材料消耗定额的确定主要适用于计算法。",[158,160,162,164,166],{"key":20,"text":159,"correct":26},"块状",{"key":24,"text":161,"correct":26},"板状",{"key":28,"text":163,"correct":26},"卷筒状产品",{"key":31,"text":165,"correct":22},"粉状",{"key":34,"text":167,"correct":22},"散粒状",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":139,"analysis":37},1162023,"按材料计划涵盖的时间段划分，可分为（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":26},"年度计划",{"key":24,"text":175,"correct":26},"季度计划",{"key":28,"text":177,"correct":26},"月度计划",{"key":31,"text":179,"correct":22},"旬计划",{"key":34,"text":181,"correct":26},"追加计划",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":194,"analysis":37},1162024,"按照计划期限材料计划除了年度计划外，还应包括（ ）。",[186,187,189,191,193],{"key":20,"text":173,"correct":22},{"key":24,"text":188,"correct":26},"月计划",{"key":28,"text":190,"correct":26},"一次性用料计划",{"key":31,"text":192,"correct":26},"临时追加计划",{"key":34,"text":175,"correct":26},"BCDE",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":209,"analysis":37},1162025,"下列（ ）不属于材料计划变更和修订主要的方法。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"全面调整或修订",{"key":24,"text":202,"correct":22},"专案调整或修订",{"key":28,"text":204,"correct":22},"临时调整或修订",{"key":31,"text":206,"correct":26},"施工进度调整",{"key":34,"text":208,"correct":26},"工艺变更设计","DE",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":82,"analysis":37},1162026,"影响材料计划的实现的因素主要有（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"施工任务的改变",{"key":24,"text":217,"correct":26},"设计变更",{"key":28,"text":219,"correct":26},"采购情况改变",{"key":31,"text":221,"correct":26},"施工进度变化",{"key":34,"text":223,"correct":22},"业主要求",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":82,"analysis":37},1162027,"项目材料、设备的配置计划按用途可以分为（ ）",[228,230,232,234,236],{"key":20,"text":229,"correct":26},"需用计划",{"key":24,"text":231,"correct":26},"申请计划",{"key":28,"text":233,"correct":26},"采购计划",{"key":31,"text":235,"correct":26},"供应计划",{"key":34,"text":181,"correct":22},{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":82,"analysis":37},1162028,"周转性材料消耗定额一般与（ ）四个因素有关。",[241,243,245,247,249],{"key":20,"text":242,"correct":26},"一次使用量",{"key":24,"text":244,"correct":26},"损耗率",{"key":28,"text":246,"correct":26},"周转次数",{"key":31,"text":248,"correct":26},"回收量",{"key":34,"text":250,"correct":22},"损耗量",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":209,"analysis":37},1162029,"与周转性材料消耗定额无关的因素是（ ）。",[255,257,258,259,261],{"key":20,"text":256,"correct":22},"一次使用量和回收量",{"key":24,"text":244,"correct":22},{"key":28,"text":246,"correct":22},{"key":31,"text":260,"correct":26},"流动率",{"key":34,"text":262,"correct":26},"出勤率",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":273,"analysis":37},1162030,"计划期内工程材料需用量计算方法包括（ ）。",[267,269,270,271,272],{"key":20,"text":268,"correct":26},"直接计算法",{"key":24,"text":147,"correct":22},{"key":28,"text":149,"correct":22},{"key":31,"text":151,"correct":26},{"key":34,"text":153,"correct":22},"AD",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":67,"analysis":37},1162031,"建筑材料计划按用途分类有需用量计划、采购计划、供应计划、加工订货计划、施工设置用料计划、还包括（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":26},"周转材料租赁计划",{"key":24,"text":281,"correct":22},"实施计划",{"key":28,"text":283,"correct":26},"主要材料节约计划",{"key":31,"text":285,"correct":22},"运输计划",{"key":34,"text":287,"correct":22},"检测计划",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":82,"analysis":37},1162032,"属于材料消耗定额范畴的是（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"半成品",{"key":24,"text":295,"correct":26},"配件",{"key":28,"text":297,"correct":26},"必要的工艺性损耗",{"key":31,"text":299,"correct":26},"废料数量",{"key":34,"text":301,"correct":22},"物料加工",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1162033,"制定材料消耗定额的原则有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"降低消耗的原则",{"key":24,"text":309,"correct":26},"实事求是的原则",{"key":28,"text":311,"correct":22},"节能适用原则",{"key":31,"text":313,"correct":26},"合理先进性原则",{"key":34,"text":315,"correct":26},"综合经济效益原则","ABDE",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":326,"analysis":37},1162034,"采用直接计算法计算施工项目某种材料计划需用量时，可采用的定额为（ ）。 A.材料消耗施工定额 B.概算定额。 C.月度计划 D.旬计划",[321,322,323,324,325],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":34,"text":34,"correct":22},"AB",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":82,"analysis":37},1162035,"用观测法制定材料的消耗定额时，所选用的观测对象应符合（ ）要求。",[331,333,335,337,339],{"key":20,"text":332,"correct":26},"建筑物应具有代表性",{"key":24,"text":334,"correct":26},"施工方法符合操作规范的要求",{"key":28,"text":336,"correct":26},"建筑材料符合技术、设计要求",{"key":31,"text":338,"correct":26},"被观测对象在节约材料和保证质量等有较好的成绩",{"key":34,"text":340,"correct":22},"建筑材料最好是新材料",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":139,"analysis":37},1162036,"列人月计划的施工项目需用材料，都要进行逐项落实，如个别品种、规格有缺口，要采取紧急措施包括（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":26},"借",{"key":24,"text":348,"correct":26},"调",{"key":28,"text":350,"correct":26},"改",{"key":31,"text":352,"correct":22},"买",{"key":34,"text":354,"correct":26},"加工",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":82,"analysis":37},1162037,"项目物资计划管理的任务有（ ）",[359,361,363,365,367],{"key":20,"text":360,"correct":26},"做好物质准备",{"key":24,"text":362,"correct":26},"做好平衡、协调工作",{"key":28,"text":364,"correct":26},"合理使用资金",{"key":31,"text":366,"correct":26},"建立健全企业物资计划管理体系",{"key":34,"text":368,"correct":22},"及时进行物资调配",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":52,"analysis":37},1162038,"已知工程结构类型及建设面积匡算主要材料需用量时，必需的数据是（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":26},"工程的建筑面积",{"key":24,"text":376,"correct":26},"该种材料消耗定额",{"key":28,"text":378,"correct":26},"调整系数",{"key":31,"text":380,"correct":22},"每万元工程量该种材料消耗定额",{"key":34,"text":382,"correct":22},"工程项目总投资",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":139,"analysis":37},1162039,"材料计划管理的基本任务包括（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":26},"为实现企业经济目标做好物质准备",{"key":24,"text":390,"correct":26},"做好平衡协调工作",{"key":28,"text":392,"correct":26},"促进材料的合理使用",{"key":31,"text":394,"correct":22},"确立材料供求平衡的观念",{"key":34,"text":396,"correct":26},"建立健全材料计划管理制度",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":112,"analysis":37},1162040,"采购品种按价格划分，可以分成（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":26},"不变价格",{"key":24,"text":404,"correct":26},"折扣价格",{"key":28,"text":406,"correct":22},"波动价格",{"key":31,"text":408,"correct":26},"区段价格",{"key":34,"text":410,"correct":22},"重点价格",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":425,"analysis":37},1162041,"项目的年材料费用总和指（ ）之和",[415,417,419,421,423],{"key":20,"text":416,"correct":26},"材料费",{"key":24,"text":418,"correct":22},"运输费",{"key":28,"text":420,"correct":26},"采购费",{"key":31,"text":422,"correct":22},"损耗费",{"key":34,"text":424,"correct":26},"仓库仓储费","ACE",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":326,"analysis":37},1162042,"材料采购方案的优选原则是（ ）之和最低。",[430,431,433,434,435],{"key":20,"text":420,"correct":26},{"key":24,"text":432,"correct":26},"储存费",{"key":28,"text":422,"correct":22},{"key":31,"text":418,"correct":22},{"key":34,"text":436,"correct":22},"二次倒运费",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},1162043,"项目材料结算方式主要为（ ）。",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"采购结算",{"key":24,"text":444,"correct":26},"企业内部结算",{"key":28,"text":446,"correct":26},"对外结算",{"key":31,"text":448,"correct":22},"供应结算",{"key":34,"text":450,"correct":22},"网上结算","BC",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":326,"analysis":37},1162044,"采购品种按供应风险可以分成（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":26},"常规品",{"key":24,"text":459,"correct":26},"紧缺品",{"key":28,"text":461,"correct":22},"单一品种",{"key":31,"text":463,"correct":22},"多品种",{"key":34,"text":465,"correct":22},"重点品种",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":194,"analysis":37},1162045,"企业材料管理主要包括（ ）业务环节。",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"订货",{"key":24,"text":473,"correct":26},"采购",{"key":28,"text":475,"correct":26},"运输",{"key":31,"text":477,"correct":26},"储备",{"key":34,"text":479,"correct":26},"供应",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":494,"analysis":37},1162046,"招标采购主要包括（ ）等，通常用于项目中大宗材料的采购，由采购企业名义组织招标。",[484,486,488,490,492],{"key":20,"text":485,"correct":26},"公开招标采购",{"key":24,"text":487,"correct":22},"谈判采购",{"key":28,"text":489,"correct":26},"邀请招标采购",{"key":31,"text":491,"correct":26},"两阶段招标采购",{"key":34,"text":493,"correct":22},"询价采购","ACD",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":316,"analysis":37},1162047,"对物资供方的评定内容有（ ）",[499,501,503,505,507],{"key":20,"text":500,"correct":26},"供方资质",{"key":24,"text":502,"correct":26},"供方质量保证能力",{"key":28,"text":504,"correct":22},"供方样品质量",{"key":31,"text":506,"correct":26},"供方服务能力",{"key":34,"text":508,"correct":26},"付款要求",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":194,"analysis":37},1162048,"材料供应管理应遵循的原则包括（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"及时大量",{"key":24,"text":516,"correct":26},"有利生产，方便施工",{"key":28,"text":518,"correct":26},"勤俭节约",{"key":31,"text":520,"correct":26},"D统筹兼顾、综合平衡",{"key":34,"text":522,"correct":26},"保证重点、兼顾一般",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":82,"analysis":37},1162049,"材料采购和加工业务过程可分为（ ）等环节。",[527,529,531,533,535],{"key":20,"text":528,"correct":26},"结算",{"key":24,"text":530,"correct":26},"准备",{"key":28,"text":532,"correct":26},"成效",{"key":31,"text":534,"correct":26},"谈判",{"key":34,"text":536,"correct":22},"结果",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":82,"analysis":37},1162050,"采购合同执行的绩效考评内容包括（ ）。",[541,543,545,547,549],{"key":20,"text":542,"correct":26},"考核“合同检查报告”",{"key":24,"text":544,"correct":26},"考核时间绩效指标",{"key":28,"text":546,"correct":26},"考核成本绩效指标",{"key":31,"text":548,"correct":26},"考核质量绩效指标",{"key":34,"text":550,"correct":22},"考核经济效益绩效指标",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":425,"analysis":37},1162051,"材料设备采购和加工订货业务，经过与供方协商取得一致意见，履行买卖手续后即为成交。成交的形式有（ ）",[555,557,559,561,563],{"key":20,"text":556,"correct":26},"签订购销合同",{"key":24,"text":558,"correct":22},"签订供货手续和方式",{"key":28,"text":560,"correct":26},"签发提货单据",{"key":31,"text":562,"correct":22},"供需双方协商",{"key":34,"text":564,"correct":26},"现货现购",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":194,"analysis":37},1162052,"在两阶段招标采购的第一阶段，采购机构就采购货物的（ ）等广泛地征求意见，并同投标商进行谈判以确定拟采购货物的技术规范。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"水平",{"key":24,"text":572,"correct":26},"质量",{"key":28,"text":574,"correct":26},"其他方面",{"key":31,"text":576,"correct":26},"合同条款",{"key":34,"text":578,"correct":26},"供货条件",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":36,"analysis":37},1162053,"市场采购具体的供货方式可分为（ ）。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"协作采购",{"key":24,"text":586,"correct":26},"现货供应",{"key":28,"text":588,"correct":26},"期货供应",{"key":31,"text":590,"correct":26},"赊销供应",{"key":34,"text":592,"correct":22},"网上采购",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":326,"analysis":37},1162054,"按照材料流通过程经过的环节不同，材料供应方式分为（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":26},"直达供应方式",{"key":24,"text":600,"correct":26},"中转供应方式",{"key":28,"text":602,"correct":22},"限额供应",{"key":31,"text":604,"correct":22},"发包方供应方式",{"key":34,"text":606,"correct":22},"承包方供应方式",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":316,"analysis":37},1162055,"材料采购应遵循（ ）原则。",[611,613,615,617,619],{"key":20,"text":612,"correct":26},"遵守法律法规",{"key":24,"text":614,"correct":26},"按计划采购",{"key":28,"text":616,"correct":22},"成本最低",{"key":31,"text":618,"correct":26},"择优采购",{"key":34,"text":620,"correct":26},"坚持“三比一算”",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":97,"analysis":37},1162056,"在中华人民共和国境内进行下列工程建设项目包括项目的（ ）以及与工程建设有关的重要设备、材料等的采购，必须进行招标。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"勘察",{"key":24,"text":628,"correct":22},"规划",{"key":28,"text":630,"correct":26},"设计",{"key":31,"text":632,"correct":26},"监理",{"key":34,"text":634,"correct":26},"施工",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":52,"analysis":37},1162057,"企业内部的结算方式包括（ ）",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"转账法",{"key":24,"text":642,"correct":26},"内部货币法",{"key":28,"text":644,"correct":26},"预付法",{"key":31,"text":646,"correct":22},"托收承付",{"key":34,"text":648,"correct":22},"现金结算",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":663,"analysis":37},1162058,"谈判采购存在（ ）特点。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"随机性和偶然性",{"key":24,"text":656,"correct":26},"合作性与冲突性",{"key":28,"text":658,"correct":26},"原则性和可调整性",{"key":31,"text":660,"correct":22},"公开性和务实性",{"key":34,"text":662,"correct":26},"经济利益中心性","BCE",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":316,"analysis":37},1162059,"对供应商作评估的最基本指标应该包括（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"技术水平",{"key":24,"text":671,"correct":26},"供应能力",{"key":28,"text":673,"correct":22},"价格水平",{"key":31,"text":675,"correct":26},"售后服务",{"key":34,"text":677,"correct":26},"快速响应能力",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":194,"analysis":37},1162060,"采购谈判的程序可分为（ ）几个阶段。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"总结阶段",{"key":24,"text":685,"correct":26},"开局阶段",{"key":28,"text":687,"correct":26},"正式洽谈阶段",{"key":31,"text":689,"correct":26},"成交阶段",{"key":34,"text":691,"correct":26},"计划和准备阶段",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":194,"analysis":37},1162061,"企业对外结算方式包括（ ）",[696,697,698,700,702],{"key":20,"text":640,"correct":22},{"key":24,"text":646,"correct":26},{"key":28,"text":699,"correct":26},"信汇结算",{"key":31,"text":701,"correct":26},"支票结算",{"key":34,"text":648,"correct":26},{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":717,"analysis":37},1162062,"材料供货商（材料供应部门）对施工生产用料单位实行（ ）。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"项目经理责任制",{"key":24,"text":710,"correct":26},"“三包”责任制",{"key":28,"text":712,"correct":22},"材料员负责制",{"key":31,"text":714,"correct":26},"“三保\\\"责任制",{"key":34,"text":716,"correct":22},"施工员负责制","BD",[719,723,726,729,732,735],{"id":720,"name":721,"category":7,"favorite":722},1,"领导干部任职前廉政法规知识测试题",92,{"id":724,"name":725,"category":7,"favorite":720},595,"建筑结构与设备",{"id":727,"name":728,"category":7,"favorite":720},715,"招标采购专业知识与法律法规",{"id":730,"name":731,"category":7,"favorite":720},848,"市政方向-通用基础",{"id":733,"name":734,"category":7,"favorite":8},534,"BIM工程师",{"id":736,"name":734,"category":7,"favorite":8},535]