[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162505":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1162505,822,3,"判断题","在软件的材料验收过程中必须采取直接在验收单中填写验收单的验收方式。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在软件的材料验收过程中有两种材料验收方式，一种为先收料，填写收料单，然后在验收中选择收料单，统一进行验收；另一种为直接在验收单中填写验收单。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)专业管理实务 岗位知识","建筑工程",0]