[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162500":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1162500,822,3,"判断题","现场余料能否内部调拨利用，往往取决于企业的管理。企业或工程项目部应建立统一的管理方法，合理确定材料调拨价格及费用核算方法，促进剩余材料的流通及合理应用。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"现场余料能否内部调拨利用，往往取决于企业的管理。企业或工程项目部应建立统一的管理方法，合理确定材料调拨价格及费用核算方法，促进剩余材料的流通及合理应用。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)专业管理实务 岗位知识","建筑工程",0]