[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162366":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1162366,822,3,"判断题","材料采购实际成本时按实际价格事后计算的预算成本支出。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"材料采购成本降低（超耗）额=材料采购预算成本一材料采购实际成本\\n式中材料采购预算成本为按预算价格事先计算的计划成本支出，材料采购实际成本是按实际价格事后计算的实际成本支出。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)专业管理实务 岗位知识","建筑工程",0]