[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162238":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1162238,822,3,"判断题","标底是建设项目的预期价格，也就是合同价。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"标底是建设项目的预期价格，但标底不等同于合同价。",{"id":6,"name":21,"category":22,"favorite":23},"(材料员)专业管理实务 岗位知识","建筑工程",0]