[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162135":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162135,822,2,"多选题","施工废弃物回收利用过程包含下列四个连续阶段组成（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","现场废弃物的收集、运输及储存",true,{"key":16,"text":17,"correct":14},"B","不同类别的建筑废弃物分类拣选",{"key":19,"text":20,"correct":14},"C","把拣选后的建筑废弃物运输到工地外的回收处理厂",{"key":22,"text":23,"correct":14},"D",",建筑废弃物重量计算和回收处理厂的准人许可",{"key":25,"text":26,"correct":27},"E","施工废弃物的加工",false,"ABCD","现场废弃物的收集、运输及储存、不同类别的建筑废弃物分类拣选、把拣选后的建筑废弃物运输到工地外的回收处理厂、建筑废弃物重量计算和回收处理厂的准人许可。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]