[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162131":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162131,822,2,"多选题","施工余料产生的原因主要有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","因建设单位变更设计，造成材料的剩余积压",true,{"key":16,"text":17,"correct":14},"B","施工单位施工方案的变更，造成材料的多余积压",{"key":19,"text":20,"correct":21},"C","由于市场材料价格出现波动",false,{"key":23,"text":24,"correct":14},"D","由于施工单位备料计划或现场发料控制的原因，造成材料余料的多余",{"key":26,"text":27,"correct":21},"E","监理单位的监督，材料出现节约","ABD","因建设单位变更设计，造成材料的剩余积压施工单位施工方案的变更，造成材料的多余积压由于施工单位备料计划或现场发料控制的原因，造成材料余料的多余。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]