[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162117":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162117,822,2,"多选题","第二类危险源的控制方法有（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","消除或减少故障",true,{"key":16,"text":17,"correct":18},"B","隔离危险物质",false,{"key":20,"text":21,"correct":14},"C","增加安全系数",{"key":23,"text":24,"correct":14},"D","设置安全监控系统",{"key":26,"text":27,"correct":14},"E","改善作业环境","ACDE","第二类危险源的控制方法有：提高各类设施的可靠性以消除或减少故障、增加安全系数、设置安全监控系统、改善作业环境等。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]