[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162107":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162107,822,2,"多选题","材料验收工作的具体程序是（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","验收准备",true,{"key":16,"text":17,"correct":14},"B","核对材料",{"key":19,"text":20,"correct":14},"C","检验实物",{"key":22,"text":23,"correct":14},"D","办理入库手续",{"key":25,"text":26,"correct":27},"E","分类保存",false,"ABCD","材料验收工作的具体程序是验收准备、核对材料、检验实物、办理入库手续。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]