[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162094":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162094,822,2,"多选题","（ ）时，施工企业可适当降低材料储备定额水平。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","抢工期",false,{"key":16,"text":17,"correct":18},"B","市场货源充裕",true,{"key":20,"text":21,"correct":14},"C","供方信誉一般",{"key":23,"text":24,"correct":18},"D","供需关系协调",{"key":26,"text":27,"correct":18},"E","信息通畅","BDE","市场货源充裕时，施工企业可适当降低材料储备定额水平。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]