[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162036":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162036,822,2,"多选题","列人月计划的施工项目需用材料，都要进行逐项落实，如个别品种、规格有缺口，要采取紧急措施包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","借",true,{"key":16,"text":17,"correct":14},"B","调",{"key":19,"text":20,"correct":14},"C","改",{"key":22,"text":23,"correct":24},"D","买",false,{"key":26,"text":27,"correct":14},"E","加工","ABCE","列人月计划的施工项目需用材料，都要进行逐项落实，如个别品种、规格有缺口，要采取紧急措施不包括买。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]