[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1162027":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1162027,822,2,"多选题","项目材料、设备的配置计划按用途可以分为（ ）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","需用计划",true,{"key":16,"text":17,"correct":14},"B","申请计划",{"key":19,"text":20,"correct":14},"C","采购计划",{"key":22,"text":23,"correct":14},"D","供应计划",{"key":25,"text":26,"correct":27},"E","追加计划",false,"ABCD","项目材料、设备的配置计划按用途可以分为需用计划、申请计划、采购计划、供应计划、储备计划。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]