[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161996":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1161996,822,2,"多选题","储备价值量核算时计算内容包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","百万元产值占用材料储备资金",true,{"key":16,"text":17,"correct":14},"B","材料周转次数",{"key":19,"text":20,"correct":14},"C","材料周转天数",{"key":22,"text":23,"correct":14},"D","流动资金中材料资金节约使用额",{"key":25,"text":26,"correct":27},"E","平均库存量",false,"ABCD","储备价值量核算时计算内容不包括平均库存量。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]