[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161968":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1161968,822,2,"多选题","随着项目法施工的不断完善，许多企业和项目开展了不同形式的控制材料消耗的方法，有（ ）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","包工包料",true,{"key":16,"text":17,"correct":14},"B","与分包签订包保合同",{"key":19,"text":20,"correct":14},"C","定额供应",{"key":22,"text":23,"correct":14},"D","包干使用",{"key":25,"text":26,"correct":27},"E","样板间控制",false,"ABCD","随着项目法施工的不断完善，许多企业和项目开展了不同形式的控制材料消耗的方法，如包工包料、与分包签订包保合同、定额供应、包干使用等。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]