[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1161924":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1161924,822,2,"多选题","限额领料的依据有（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","材料的预算定额",false,{"key":16,"text":17,"correct":18},"B","材料的消耗定额",true,{"key":20,"text":21,"correct":14},"C","材料的库存数量",{"key":23,"text":24,"correct":18},"D","材料使用者承担的工程量",{"key":26,"text":27,"correct":18},"E","必须采取的技术措施","BDE","限额领料的依据有：材料的消耗定额；材料使用者承担的工程量或工作量；施工中必须采取的技术措施。",{"id":6,"name":31,"category":32,"favorite":33},"(材料员)专业管理实务 岗位知识","建筑工程",0]